Überspringen
Jetzt Frühbuchervorteil für die PCIM Expo 2027 sichern

Melden Sie sich bis zum 31.07.2026 als Aussteller an und sichern Sie sich Ihre Standfläche zu attraktiven Frühbucherpreisen.

Power Semiconductor Solutions for BESS 1.5kV Battery Voltage

11.06.2026

Referent: Pablo Cortes, Field Application Engineering Manager, Littelfuse

Battery Energy Storage Systems (BESS) offer a clean and effective way to support the integration of renewable energy into the grid. Power Semiconductors are essential to meeting the demanding performance requirements of these systems. This presentation will provide an insight into power semiconductor solutions designed for 1.5kV Battery Voltage BESS applications.

Mehr zur Person

Pablo Cortes

Pablo Cortes

Field Application Engineering Manager, Littelfuse

Pablo Cortes holds a master's degree in electrical engineering from the Madrid Polytechnic University of Technology, and an MBA. He joined Littelfuse in 2020, currently managing the Field Application Engineering Team (Semiconductor Business Unit). He speaks English, German, French, and Spanish and has a strong background in power semiconductors, with nearly 20 years of experience working in various positions, including R&D, FAE, Application Engineering, Marketing, and Sales.

Das könnte Sie auch interessieren