Skip
Secure your early bird price for the PCIM Expo 2027 now!

Register as an exhibitor by 31 July 2026 and benefit from attractive early bird rates for your stand space.

Power Semiconductor Solutions for BESS 1.5kV Battery Voltage

11 Jun 2026

Speaker: Pablo Cortes, Field Application Engineering Manager, Littelfuse

Battery Energy Storage Systems (BESS) offer a clean and effective way to support the integration of renewable energy into the grid. Power Semiconductors are essential to meeting the demanding performance requirements of these systems. This presentation will provide an insight into power semiconductor solutions designed for 1.5kV Battery Voltage BESS applications.

More about the person

Pablo Cortes

Pablo Cortes

Field Application Engineering Manager, Littelfuse

Pablo Cortes holds a master's degree in electrical engineering from the Madrid Polytechnic University of Technology, and an MBA. He joined Littelfuse in 2020, currently managing the Field Application Engineering Team (Semiconductor Business Unit). He speaks English, German, French, and Spanish and has a strong background in power semiconductors, with nearly 20 years of experience working in various positions, including R&D, FAE, Application Engineering, Marketing, and Sales.

You might also be interested in